Looking for good practice when occupying a control point with an RTK base.
Asked October 25, 2026
AI answer · not yet verified by a surveyor
Good base practice prevents errors that carry into everything you collect [1]:
- Verify the point: confirm the monument, its published or record coordinates, and the datum, epoch and geoid.
- Set up carefully: level and plumb the tripod, and measure antenna height twice, to the correct reference on the antenna.
- Enter the right values: coordinates, antenna type and height in the base and rover settings.
- Check in immediately: occupy a second known point with the rover before collecting data, and compare the horizontal and vertical residuals.
- Repeat checks during the day and at the end of the session.
- Record metadata: time, PDOP, satellites and any warnings.
If you work in a projected or ground system, confirm the scale factors and the project setup before the first shot [2].
General information only. Answers here are not a survey or legal advice, and no one here can tell you where your boundary is. For your property, hire a licensed land surveyor in your state; for legal questions, a real-estate attorney.