What checks do you run on a total station before starting a job?

Share
Field work and equipment0 answersAI answer

Looking for a practical daily routine for instrument checks in the field.

Asked October 25, 2026

AI answer · not yet verified by a surveyor

A short routine catches most problems [1]:

  • Leveling: check the tribrach and level bubble, and the optical or laser plummet against a known mark.
  • Collimation and trunnion axis: run the instrument's two-face check, and recalibrate if the errors drift beyond the manufacturer's spec.
  • Prism constant and atmospheric settings: confirm the prism type and constant, plus temperature and pressure entries (or the built-in sensor).
  • Height of instrument and rod: measure twice and record both.
  • Backsight check: observe a second known point, and check the distance and elevation against the record values before collecting data.
  • Rod bubble: check it regularly against a plumb reference.

Keep a calibration log and send the instrument for service on the recommended schedule. For elevations, confirm the benchmark and datum match the project [2].

General information only. Answers here are not a survey or legal advice, and no one here can tell you where your boundary is. For your property, hire a licensed land surveyor in your state; for legal questions, a real-estate attorney.

Your answer